Mergen Demo Construction 39/60
Skip to content

Since 2006 · Northgate · Harbor District · Westfield

Solid ground, transparent process, on-time delivery

From design to turnkey handover for homes, villas and commercial buildings; in urban renewal, documented and inspected construction planned together with the owners.

  • Structural design to the seismic building code
  • Monthly site reports for owners
  • Class A general contractor license

Estimate cost Call us +1 (555) 016-0940

Request a project quote

Leave your number and our project coordinator will call you.

Or calculate the price yourself →

  • 64projects delivered
  • 1.400+homes
  • 0fatal site accidents
  • ISO 9001 · 14001 · 45001management systems
Step by step for owners

The Urban Renewal Process

We handle every step on your behalf under urban renewal legislation, from the at-risk building assessment to the handover of title deeds.

  1. Step 12–4 weeks

    At-risk building assessment

    Core sampling and soil review by a licensed firm; the report is noted on the title deed at the land registry.

    What to bring
    • Copy of title deed
    • List of unit owners
  2. Step 21–2 months

    Owners' decision

    A decision by at least a two-thirds majority of owners and shares; the land-for-units agreement is signed before a notary.

  3. Step 32–3 months

    Design & permits

    Architectural, structural and MEP drawings; city approval and building permit.

  4. Step 41 month

    Vacating & demolition

    Rent assistance applications, utility disconnections and controlled demolition.

  5. Step 514–20 months

    Construction & inspection

    Construction under independent building inspection; monthly photo reports for owners.

  6. Step 6At handover

    Occupancy permit & title

    Occupancy permit, registration of completed units on the title deed and key handover.

Get a preliminary assessment of your building

Latest from our sites · sample data

Projects in Progress

CompletedIn progressPlanned Progress: 50%
  1. Delivery: March 2027In progress

    Begonia Court, Northgate

    24 units · urban renewal · structure complete, finishing work underway (72%).

  2. Delivery: September 2027In progress

    Olive Grove Homes, Harbor District

    12 villas · turnkey · foundations and basements complete (38%).

  3. Delivery: June 2027In progress

    Westfield Logistics Warehouse

    18,000 m² steel structure · roof and facade cladding underway (55%).

  4. Start: January 2027Planned

    Plane Tree Residences, Northgate

    3 blocks, 96 units · permit issued, vacating being planned.

  5. Delivered: October 2026Completed

    Shoreline Residences, Harbor District

    40 units · occupancy permit issued, title deeds handed over to owners.

Services

What We Do

Our Certifications

Our quality, environmental and health and safety management systems and licenses

  • ISO 9001:2015 Quality Management System — Meridian CertificationISO 9001:2015 Quality Management System — Meridian Certification
  • ISO 14001:2015 Environmental Management System — Meridian CertificationISO 14001:2015 Environmental Management System — Meridian Certification
  • ISO 45001:2018 Occupational Health & Safety — Meridian CertificationISO 45001:2018 Occupational Health & Safety — Meridian Certification
  • National Contractors Association — MemberNational Contractors Association — Member
  • General Contractor License — Class AGeneral Contractor License — Class A
  • Green Building Rating Certificate — EcoBuild CouncilGreen Building Rating Certificate — EcoBuild Council

See your project's preliminary cost right away

Choose the project type, floor area and finish level to get an instant estimated budget range.

Estimate cost or call now+1 (555) 016-0940

From our engineers and architects

Building Guide

Stonearch Building & Architecture

Welcome back

Log in to your account; your saved posts and comments are waiting for you.