Westfield Office Building (In progress)

A 9-story office building with 6,200 m² of usable space in central Westfield. The structure is complete, and facade and MEP work are underway.

VerdictProgress: 60% · Planned delivery: October 2026
Drag the line to compare.

The office building under construction in Westfield has nine floors and two basement levels. Flexible office floors, generous column spacing and raised-floor infrastructure allow it to adapt to different tenants’ needs.

Current status

  • The structural frame is complete.
  • Curtain wall installation is underway (about 40%).
  • Mechanical and electrical work is progressing floor by floor.
  • Elevator installation is scheduled.

Planned features

Heat-recovery ventilation, LED lighting and EV charging in the parking garage are part of the project. The investor receives a monthly management report and budget-vs-actual sheet.