Plumbing replacement in a 1970s building in Old Town
Replacing low-pressure, failure-prone galvanized plumbing alongside a bathroom and kitchen renovation.
VerdictThe supply and waste lines were replaced in three days, and the pre-closing pressure test was documented with photos.

The owners of an apartment in a 1970s building in Old Town were planning a bathroom and kitchen renovation. The galvanized pipes had rusted from the inside, so water pressure was very low, and there had been two leaks in the past year.
What we did
- The supply lines were converted to PPR pipe with a manifold system.
- The waste lines were replaced with PVC pipe, and the bathroom drain falls were corrected.
- A concealed toilet cistern and main shut-off valves were installed.
- Every line was pressure tested before the walls were closed up.
Before handing over to the tiling team, we prepared a layout drawing with photos of the pipes that would be concealed and gave it to the owner.
References
AllOther projects
-
The leak was found in 40 minutes, and the repair was completed by lifting just two tiles. Leak DetectionNon-invasive leak detection in Westfield
-
After flushing, the difference between the top and bottom surface temperatures of the radiators dropped significantly. Radiator FlushingMachine radiator flushing in a 15-radiator duplex
-
The fault was fixed the same day, and the combustion analysis readings were sent to the customer with the service report. Combi Boiler RepairBoiler ignition fault: ionization electrode replacement